Nabisco Project consists of additional warehouse and parking space
to an existing storage facility. One V2B1 Model #3 Stormwater
Treatment System was installed to treat the existing and new
additional stormwater runoff.
V2B1 Mode #3 -
Installation of the 1st pieces of the D1 sediment chamber and
D2 floatables chamber
V2B1 Model #3 - View of
coriolus notch in pipe, and
floatables baffle wall
V2B1 Model #3 - View of D1
sediment chamber and floatables chamber installed with
coriolous pipe
V2B1 Model #3 – View of 15"
diameter coriolus pipe and 15" diameter tangential
pipe
V2B1 Model #3 – View of D1
sediment chamber and D2 floatables chamber installed